The process
Permits, inspections, and the parts that take time.
Feasibility first. Before design, whether what you want is possible on your lot: setbacks, easements, HOA restrictions, and what the existing structure can carry.
Engineering where required. Structural work that changes load paths needs an engineer, not an opinion. We will tell you when that is the case rather than proceeding and hoping.
Permits and inspections. Comal County and the City of New Braunfels have their own requirements and their own timelines. These are not the part to rush, and a contractor offering to skip them is offering you a liability.
Build, in sequence. Foundation, framing, dry-in, rough trades, inspections, finish. Each step gated by the one before it.
The honest note on schedule: permit and inspection timelines are outside any contractor’s control. Anyone guaranteeing a completion date without acknowledging that is guessing.